Round black magnetic assembly with a center hole.
A request for quotation (RFQ) for a magnetic assembly should include a current drawing, the assembly's function and interfaces, known magnet requirements, service conditions, and the quantities to quote. If the design is still open, identify the assumptions you want the supplier to review. This gives both sides a clear basis for an initial estimate.
Start with the function and mounting position
Describe what the assembly does, where it mounts, and what it acts on. For a magnetic latch, name the mating plate and show its position when closed. If holding force matters, state the load direction, working gap, and test setup. A force value without those conditions leaves the requirement open to interpretation.
Write a functional requirement that can be quoted
Describe the event you need the assembly to handle. For a latch, say whether the requirement is to hold a panel closed under a load or to release it within a range of opening forces. Mark the load direction with an arrow.
List the mating plate material, the installed gap, and any finish or intervening layer that changes the distance between surfaces. If your only reference is an existing unit, identify which behavior you want to match and how it was observed. Ask the supplier to identify the inputs needed to turn that observation into a testable requirement.
Show the interfaces on a controlled drawing
Show the installed envelope, mounting faces, holes, and features that locate the assembly. Call out units, critical tolerances, and the drawing revision. If you send a 3D model as well, identify which file controls when the two differ. Include the mating part view when its dimensions affect fit.
Use an assembly view and detail drawings together
Use the assembly view to show how the parts relate. Use detail drawings to define the features that are made and checked on individual parts. Give each attachment a part number and revision. If you redact the drawing, keep the interfaces that explain fit and remove unrelated geometry.
For example, a cropped section can show a mounting face, its hole pattern, and the nearby keepout area without disclosing the full equipment layout. Check that the cut view still shows units, orientation, and any note that applies to the exposed dimensions. Include a file list if you send several attachments.
State magnet, environment, and build requirements
List the known magnet material, shape, and pole layout. Tie polarity to a named face or view. Report service temperatures, relevant fluids, mating materials, and the planned retention method. Identify any open choices. If a sample is available, label its revision and explain which features it represents.
Specify the state in which parts are checked
A dimension can refer to an unfinished magnet, a coated magnet, or the completed assembly. Specify the intended condition wherever the result depends on it. If the magnetic requirement applies at the assembly level, describe the fixture, load direction, and measurement position.
Ask whether the quote assumes inspection of each item, a sample from each lot, or a first sample report. Leave the sampling frequency open if your quality team has yet to approve it. The supplier can identify what is included in the quote, and the buyer can compare offers using the same inspection scope.
Can you send an early drawing?
Yes. Mark it as preliminary and name the dimensions or tests that could change. Ask the supplier to state the assumptions used for the estimate. Before a production quote, align the current drawing and confirm which open items could still change the price or the acceptance plan. Keep a short file register with the document name, revision, and status. Include it in the RFQ so reviewers can tell which dimensions are ready for quotation and which still need design input.
Separate an estimate from a production quote
For an early estimate, give an expected volume range and list the decisions that could change the price. Typical open items include a material grade, a finish, or an acceptance test. For a production quote, provide an agreed drawing revision, the requested delivery state, and the inspection requirements that go with it. If you need samples first, say what decision those samples are intended to support.
A fit sample may answer whether mounting holes line up. A functional sample may also need the intended magnetization and mating part. Ask the supplier to state any difference between the sample and planned production builds.
Review the RFQ before sending
For a latch inquiry, a short note can say that the supplier should quote the concept shown on the attached assembly drawing, using the indicated mating plate and opening direction. Put the sample quantity and later order volume on separate lines. If the force limit is open, ask what information would be needed to define it. If the plate specification is final, include its document number so it stays tied to the quote.
Check the revision on each file, then list prototype quantity and expected order volumes separately. Include inspection items, acceptance limits where defined, and the questions that could affect price or feasibility. If a magnet and its support need review together, start with Magnetic Assemblies. Send a drawing with confidential identifiers removed and ask which inputs are still needed via Contact Us.