Menu

Blogs

Search

Blog category

Popular Blogs

Get Touch

Magnet Drawing Tolerances and Inspection Requirements
Blogs 2026-11-13

Set magnet tolerances around the features that control fit, location, and function. State how each critical dimension should be checked and which condition the part is in at inspection. Review the drawing and the inspection plan together before sampling.

Identify dimensions that affect fit

Start with the mating part. A ring bore may clear a shaft, while a mounting face may set the end position. Mark dimensions that could stop assembly or move the magnet outside its allowed position. Give other features limits appropriate to their role. If a tighter limit is proposed, explain the fit or performance issue it solves.

Work backward from an assembly failure

Start by asking what would happen if a feature reached either end of its allowed size range. A ring with a small bore might stop on a shaft before reaching its seat. A block that is too high might interfere with a cover.

Write the relevant condition beside each critical feature in the review notes and use it to discuss the limit with the supplier. For dimensions that serve only as an outside boundary, check whether the available space can allow a wider range. This review makes it easier to explain why a tight limit is necessary and where the drawing has room for change.

Define the measurement reference and location

Show units, the drawing revision, and any datums that control location or orientation. On a disk or block, define where thickness is checked if chamfers or rounded edges are present. On a ring, distinguish the straight bore from its entrance. For an arc segment, identify the arc center or profile reference. If your drawing invokes a standard, give the designation and edition. See ASME Y14 drawing standards.

Agree how the reference is established in practice

A datum named on a drawing gives the inspection team a common reference. Review how the finished part will actually sit or be held during measurement, especially if its edges are rounded or the locating surface is small. If a magnet is inspected in a fixture, identify the locating contacts and the direction of the check.

Ask whether the proposed setup can reach the measurement region without seating on the chamfer or coating buildup. For drawings using geometric dimensioning and tolerancing, follow the rules of the cited edition and discuss any unclear application before releasing the purchase drawing. See ASME Y14 drawing standards.

Agree on acceptance before sampling

Record the dimensions and appearance features to inspect, along with their limits, part condition, and sampling plan if required. For a coated part, confirm whether acceptance applies after coating. Compare first sample results with the same revision and confirm fit in a representative assembly where relevant.

Create an inspection row for each critical feature

An inspection row can name the drawing callout, characteristic, limit and unit, measurement method, part condition, and reporting requirement. For a ring bore, identify the region to measure and whether a pass or fail result is sufficient. For a thickness that sets a final gap, the buyer may need the actual value to compare with a fit check.

If appearance is checked, specify the surfaces, defect types, and agreed acceptance criteria. Ask the supplier to flag any method that requires a fixture or an alternate measurement so the same agreement applies to the first samples and later deliveries.

What should an initial report show?

Make each reported result traceable to a drawing callout or inspection item. Show the actual measured value where required, including its unit and sample identifier. If the buyer and supplier cannot reproduce a result, compare the part orientation, fixture, and measurement location before changing a tolerance. If a fit check catches an issue that the dimensional report missed, document the mating part and which feature contacted first. Use those observations to decide whether the drawing needs another control or the existing inspection needs a different setup.

Use the first sample to compare both inspection setups

Use an identified sample from the first build and ask both teams to record how they measure a critical feature. If the results differ, compare the unit, inspection condition, measurement location, and support points first. An example is an arc segment measured from a fixture surface that differs from the drawing reference.

Keep the discrepancy separate from the decision on whether the part fits. Review it with the design and quality teams, then record any agreed update to the drawing or inspection plan. Use the revised records together on subsequent orders.

Send the drawing and inspection notes

Attach a marked inspection sheet if the drawing has several close dimensions. Label the features the supplier must report and identify where a simple fit check is also needed. If a ring has an inspection requirement for the bore and a trial fit with a shaft, list them separately and name the shaft revision used for the trial. This makes it possible to trace an assembly issue back to the dimensions and conditions involved.

Use Ferrite Magnets or Neodymium Magnets to identify the product family. Send the latest drawing and list the critical checks via Contact Us. Ask whether the proposed measurement setup and reporting format can be used on your geometry.


+86-151 0589 2562